From:                              route@monster.com

Sent:                               Friday, April 29, 2016 3:27 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: osp engineer

 

This resume has been forwarded to you at the request of Monster User xapeix03

Michael Parker 

Last updated:  02/23/16

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Charlotte Hall, MD  20622
US

Mobile: 301-884-4156   
mikaparker@comcast.net

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Michael Parker

Resume Value: hbs223umw3yrae2r   

  

 


 

Competency Strengths:

·               Project Management

·               Quality Assurance

·               Problem Solving

·               Safety knowledge

·               Microsoft Project Experience

·               VISIO Experience

·               Facility Management

·               Electronic Security

 

 

Technical Knowledge:

·               Telecommunication Outside Plant,

·               Circuitry

·               Inter-building construction

·               Intra-building construction

·               Electronic Security

·               Configuration Management

·               Facilities Management

 

1

 


 

 

1

 


 

 


EXPERIENCE

 

CKA LLC.

Sterling Va. November 2012 – March 2015

System Engineer Manager

I managed 4 people, assigning the space and power for the installation and documentation of equipment in a Data Center consisting of 12 server rooms with 4 classifications. I developed processes to follow the progress of projects that could take up to a year to complete. We carried up to 70 tickets at a time.

 

Facilities Management was a secondary part of my mission. My team was responsible for making sure the power, environment, interconnections and space were available and in working order for all 12 consolidated server rooms. I spent 5 months as the CKA Data Center Facility Management.

 

Communication Science Corporation (CSC),

Fairfax VA. March, 2009 – February, 2012

IT Engineer Manager

I was a contract manager for the last 4 IT projects inside and outside of the Pentagon for PENREN; 1 large building and 3 backfill areas. While doing those 4 larger projects I managed numerous smaller projects. My mission was to follow IT projects from inception to transition to the customer. I was central to the resolution of conflicts between the IT contractor, the customer, the general contract and ITA the Pentagons IT agency (USAITA). I advised the government whether the IT contractor met the contractual obligations for payment. Our IT projects stayed on time, never delaying the general contractors and on budget. These projects included building Telephone Closets, installing all pertinent IT and Telecommunication equipment, both ISP and OSP. Since PENREN IT was closing down I was also responsible for QA/QC, making sure the contractor met all relevant codes, NEC, TIA/EIA, BICSI, Pentagon regulations and TEMPEST. These projects included all Electronic Security for the physical security of the projects.

 

The Pentagon Emergency Response Facility was the largest project I was involved in. I worked on this for 4 years from initial inception, through design, construction and transition to the customer and USAITA.

 

SMS Data Products Group, Inc.

Sterling Va. February, 2006 – March, 2009

IT Engineering Manager

I was brought in by PENREN to manage existing Outside Plant (OSP) contracts. The government tasked me with reviewing all contracts and advice them whether their OSP needs were being met by the contracts and whether the price was reasonable. After the contracts were signed I managed the OSP contracts with all relevant codes, NEC, TIA/EIA, BICSI, Pentagon regulations and TEMPEST. I kept the projects on time and in budget.

 

During my time with SMS my responsibilities increased to overall management of complete projects including the OSP and Inside Plant ( ISP). The 911 Memorial and Center Courtyard were the highlight of my projects. I worked on these projects from initial inception, through design, construction and transition to the customer and USAITA.

 

I was tasked with administering the installation and maintenance of all work in the OSP arena. I used VISIO to document all of the cables in the underground plant. In 2009 I managed the transition of the OSP to USAITA.

 


Electronic Security Services Inc.

Upper Marlboro Md. January, 2000 – September, 2003 & March, 2005 – February, 2006

Project Manager

 

For over 3 years I performed over-all project management, engineering and sales for a large number of contracts on the George Washington University Campus, covering about 80% of the buildings over 2 campuses. I managed the security for the initial Mount Vernon campus, MPA building and the Elliot School building.

 

The rest of my time I managed projects for commercial projects and multi – tenant buildings. Foxwell apartments, Walter Reed annex and PARC Somerset were a few of my projects

 

I managed the design, installation, testing and marketing for the following security related equipment for commercial buildings; Door Access Systems, various security systems, IDS CCTV projects, CCTV, ESS and alarm transmission design over Landline, Fiber Optic, Wireless and Ethernet and Alarms design and installation.

 

Old Bay Construction, General Contractor (small family owned business)

Waldorf Md. September, September, 2003 – March, 2005

Project Manager

I managed a variety of jobs including building home additions, handyman work, projects surveying, developed cost sheets, managed subcontractors, met with inspectors and obtained permits.  I worked part-time as an Electrical contractor with West River Electric, working on commercial and residential electrical installation, including the Installation of a Power Distribution Unit.

 

Zapata Electric

Waldorf Md. October, 1999 – January, 2000

Electrician

As an Electrician at Zapata, assisted with installation of 100kv generator and Automatic Transfer Switch. I rewired new Emergency Panel and conducted various conduit and wire runs during remodeling.

 

Bell Atlantic Telephone Company,

Waldorf Md. February, 1968- September, 1999                                          

Cable Splicing Technician

During 31+ years with Chesapeake Telephone Co. /Bell Atlantic, Mike held a variety of positions, Construction Splicer, Maintenance Splicing Technician, Services Technician, Lineman, and Frame Attendant.

 

US ARMY,

Camp Casey, Korea, September, 1969 – August, 1971

Field Cable Man

·Served 2 years as a Field Cable Man (36C) with the US Army in Fort Bragg and Korea, supplying tactical cable and wire for the respective units. Separated from the Army as a Sergeant E5. Served about 3 months as a Platoon Sergeant, managing a field cabling platoon.

 

EDUCATION AND TRAINING:

·   High School

                      PMI Project Management Certification Test Preparation Class, 24 PMI Credits

                      30 hour OSHA Safety certificate

                      Introduction to Management/Engineering, Charles County Community College 

 

REFERENCES: available upon request.

1

 

MICHAEL J. PARKER

 

38240 William Court

Charlotte Hall

Maryland 20622

Home 301-884-4156

Cell 301-752-3956

mikaparker@comcast.net

 

 

PROFILE

 

I find the opportunity of engineering and managing an Electronic Security or IT project from design to final completion, while keeping it on schedule and within the contract parameters, especially rewarding.

 

I have over 47 years experience in IT, Telecommunication and Electronic Security construction. For the past 15+ years I have been a Manager in Engineering and Project Management. For 8 of the last 9 years I have been an IT engineering contractor for the Department of Defense working with the Pentagon Renovation Program (PENREN) and the Army Internet Telecommunication Agency (ITA).  

·   As an IT manager for the Department of Defense, I served as an Outside Plant engineer, IT Project Manager/Engineer, an IT contract advisor and a Change/Configuration Manager in a large Data Center. For my first 6 years I was responsible for bringing 5 large projects in on time and in budget as well as a number of smaller projects. For  the last year I was given the responsibility of directing 4 people assigning the space and power for  the installation and documentation of equipment in  a Data Center consisting of 12 separate rooms with 4 classifications.

 

·   As an Electronic Security Project Manager, I designed, engineered, wrote contracts and managed a multitude of projects to include all aspects of Electronic Security. The highest gross income year I had was 936 thousand dollars. All of the projects I managed remained on schedule and on the budget I developed.

 

·   During my telephone career I worked as a Frame Attendant, Installer/Repairman, Lineman and Cable Splicer. I worked overhead, buried and underground projects. I worked with copper and fiber cable and drops.

 

CLEARANCE: Top Secret

 

Service: US Army Veteran

 

1

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Systems Engineer

CKA LLC

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Active Top Secret

US Military Service:

Yes

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

IT Project Manager

Desired Job Type:

Employee
Temporary/Contract/Project

Desired Status:

Full-Time
Per Diem

 

Target Company:

Company Size:

Industry:

Telecommunications Services
Security and Surveillance

Occupation:

Installation/Maintenance/Repair

·         Wire and Cable Install/Maintain/Repair

Security/Protective Services

·         General/Other: Security/Protective Services

Project/Program Management

·         IT Project Management

 

Target Locations:

Selected Locations:

US-MD-Prince George's County

Relocate:

No

Willingness to travel:

Up to 25% travel

 

Languages:

Languages

Proficiency Level

English

Fluent